A Level 2 ASP. The supply must be safely disconnected at the network side and the old service made safe before demolition starts. Book it early, because the demolition can’t go ahead without it.
Each dwelling usually gets its own meter and electricity account. Whether they share a service or have separate connections depends on the site and Ausgrid’s requirements, which we confirm at the planning stage.
Often, if it’s a private pole. We can relocate or replace private poles to clear a driveway or building footprint. Poles owned by Ausgrid are moved through Ausgrid’s own relocation process.
The address, plans, your builder’s program and photos of the existing service and meter board. If you already have Ausgrid paperwork for the connection, send that too.
Yes. We cover Canterbury-Bankstown, including Punchbowl, Padstow, Revesby, Yagoona and Birrong.
Send us your address, plans and build timeline, and we’ll quote every stage from disconnection to final connection.