Yes, for the supply side. Installing the meters and consumer mains and connecting the new dwellings to the Ausgrid network is Level 2 work. Your general electrician can still wire the inside of each home.
An MPD, or main power distribution board, holds the meters and main switches for several dwellings in one place. It’s common in townhouse developments, small unit blocks and mixed-use buildings.
Usually, yes. Each dwelling is given its own meter so it can have a separate account with a retailer. This is planned at the design stage so the board has a position for every meter.
Yes. The supply has to be safely disconnected before demolition starts. A Level 2 electrician disconnects at the network side and, if the builder needs it, sets up a temporary builders supply.
The address, the number of dwellings, any plans or electrical layout, photos of the current meter board and your builder’s timeline. The more we see upfront, the more accurate the quote.
end us the address, the number of dwellings and any plans, and we’ll map out the metering and supply work before it holds up your build. We take calls from 8 am to 8 pm, seven days a week.