Most residential switchboard upgrades are completed within half a day, while larger or more complex systems may take longer.
The actual time depends on the condition of the existing board and whether additional mains, cabling or other electrical work is required.
The cost depends on the size of the board and the electrical work needed at the property.
Factors such as circuit numbers, existing wiring, consumer mains, safety protection and asbestos-backed panels can affect the scope. Eris Electrical provides an upfront fixed-price quote before the agreed work starts.
Yes, an older ceramic fuse board can be replaced with a modern switchboard where an upgrade is appropriate for the property.
The existing board and wiring should be checked first so the replacement can be scoped around the current electrical installation and future load.
Not automatically, but the existing switchboard needs enough capacity and suitable protection for the additional electrical load.
If the board cannot accommodate the planned circuits or equipment, switchboard or related supply work may need to be completed before the new installation proceeds.
Switchboard work must be completed by an appropriately licensed electrician, and any component that falls within Level 2 ASP authorisation requires the relevant Level 2 capability.
Eris Electrical holds Electrical Contractor Licence #204698C and Authorised Level 2 ASP Licence #3022 and provides switchboard and related Level 2 electrical work across Sydney.
Old switchboard causing problems, or planning electrical work that the existing board may not support? You do not need to decide for yourself whether the answer is a repair, full replacement or related mains work.
Tell Eris Electrical what is happening at the property and what electrical work you are planning. We can check the switchboard and provide a clear scope for the work required.