Not always. It depends on how close the scaffold and painters will be to the service line. If they’ll be inside the safe working distance, the line needs to be made safe first. Send us photos and we’ll advise.
Only if they’re a Level 2 ASP. Disconnecting at the point of supply is network-side work and can’t be done by a general electrician.
As soon as you have a start date from your trades. That way the disconnection and reconnection can be lined up with the scaffold going up and coming down.
It depends on the job. Short work may only need the power off for part of a day. Longer renovations often use a temporary builders supply so the site has power while the house is disconnected.
Often, yes. If the line will keep getting in the way, it can be rerouted to a new attachment point or converted to underground, depending on the site and Ausgrid’s requirements. We can price this alongside the temporary disconnection.
Send us the address and your start date, then share photos of the line once we’re in touch, and we’ll organise the disconnection and reconnection around your trades.